T&H Dental Clinic
A new building for a long standing member of the Yorkton business community!
The new building is behind the existing clinic
Pile are done and the grade beam gets started
Pileboxes over the interior piles
Completed grade beam ready for the pour
Concrete grade beam stripped
Waterproofing and rigid insulation for the perimeter
Grade beam complete and interior crawlspace ready for construction
Floor trusses designed to sit inside the grade beam
Finished floor sheathing
Wall construction begins
A spring jobsite often is a wet jobsite
Roof trusses going up on a sunny day
Exterior sheathing
Roof sheathing
Roof insulation
Exterior sheathing complete
Exterior framing all done
Batt insulation and poly underway
Interior metal framing can begin before the exterior walls are drywalled so that mechanical and electrical contractors can get to work.
Drywall begins
Moisture resistant drywall near showers
Mechanical ducts go in a framing continues
Interior ducting from the mechanical roof units
A view of the electrical conduits with the steel framing
Wood backing is also an important factor with metal studs for a fastening surface
Roll roofing membrane
The exterior EIFS getting started
Office windows
Mechnical roof units
Continuing the roofing membranes
Continuing the exterior EIFS
Exterior glazing
Exterior sidewalks go in before the weather gets cold
Integrated planters with the sidewalks
More layers of the EIFS
Scaffolding for the exterior
The cabinetry is all built in our finishing shop before being moved to site
An enormous amount of cabinetry in this project!
Exterior main door
The entire interior gets a subfloor before flooring install