Jobsite Mechanical Services – Phase 3 Addition
The 3rd phase of this company’s expansion at their busy shop.
Piles are in for the new grade beam
Concrete forms
Ready for the pour
Grade beam stripped & ready for steel
Rigid frames underway
Steel framing
Roof framing
Upper window openings
The connection point between the two shops
Start of the roof panels
Roof closed in
Starting the exterior cladding
Cladding continues even on a gloomy winter day!
Openings trimmed out
Roof trims
Fascia
The link between the two spaces
Contrasting trims
Lots of space for expansion
Starting to stack overhead doors
Completed overhead install
Prep for concrete slab
Rigid insulation under the slab
Continuing slab prep
Ready for the concrete
Fire proofing the link walls
One slab pour complete
2nd pour
Slab complete
Interior cladding
Finishing interior
Interior crane
Rebuild room
Equipment loaded in
Mezzanine space
Enclosed bay
Front view
Rear view