Grade Beam, Wood Framing, Concrete Slab, Interior Finishing, Exterior Finishing
Perimeter start of building
Starting the grade beam
Pump truck on site to get concrete in place
Cold day for a pour!
Concrete has to be hoarded at these temperatures
Forms stripped
Wood delivery to site
Start of wall framing
Front wall
Side of building
This has been a cold jobsite, but Saskatchewan skies make it better
Sheathing is the next step
Completed front wall
The start of installing trusses
Geometry
Ready for roof sheathing
Roof sheathing
Roof shield and strapping
Building paper
Insulating the 2x8 walls
Interior sheathing
Exterior finishing
Wall cladding underway
Gable ends
Start of the overhead door install
Overhead door installation
Things are looking close to finished on the exterior
Exterior doors get installed
Flatwork underway
Ready for the pour
Drain
Finished slab
Finished slab
Interior framing
Fire separation
Interior trim
Interior trim & rubber base

Contact Us
N.L. Construction Inc.
340 Ball Rd
Yorkton, SK
S3N 2W7
Office: 306.783.1443
Fax: 306.783.1423
Email: wbarton@nl-construction.com
340 Ball Rd
Yorkton, SK
S3N 2W7
Office: 306.783.1443
Fax: 306.783.1423
Email: wbarton@nl-construction.com